Posts

Showing posts from May, 2023

Week - 4 Footings in

Image
Two awesome things happened this 4th week of our Lake House Build. First our Footings are in and they look great.  Second, 12 years ago we found a super rare flower/plant (Lady Slipper see pic below), this week we found another 20 feet from the first sighting.

Week - 3 Waiting on concrete footings

  🙅No movement, waiting on Concrete footings and walls.

Week 2 Dig Footing ready for concrete

Image
  Week 2: Mark and dig down 4 feet 4 inches for footings and walls.  Four hours with backhoe and three days hand digging. Now time to call the concrete guy.

Week 1 - Remove old concrete footings

Image
 First Week in May:   Remove old concrete footings, some are 3.5 feet deep.  Two days and they are gone, ready to dig new footings.  Found an old Beer bottle under one of the footings.  The Date embossed on the bottom is 1955. That makes the old footing 68 years old.

We started our East Lake Cabin After 12 years

Image
 After Camping at our East Lake property for 12 years we started building a 1260 sq ft cabin this year (2023).  Please follow along as we will try and post once a week on our progress. Here are the current drawings with the County Building Dept.