WEEK 12 START FRAMING

Image
 Trusses are 3 weeks out. Time to frame all the walls.  Laid out and cut all bottom and top plates for exterior and interior walls. 

WEEK 11 RECEIVE LUMBER AND START WORK ON DECK

Image
 We received 1/2 our lumber order and that was messed up.  Got the second 1/2 with only one mistake. Worked on the deck footings and piers and ordered the concrete blocks for piers and retaining walls.  Let's see how much of this order Lowe's gets right...

WEEK 10 CONCRETE FLOOR AND FOOTINGS FOR DECK

Image
 Concrete floor is in and looks awesome, also dug and poured footing for Deck. Windows and lumber on order.

WEEK 9 PLASTIC, FOAM, PEX AND FRAME FOR FLAT WORK

Image
 Busy week, putting down the plastic, foam board and pex for radiant in floor heat, then frame items for flat work.  Now waiting for concrete guys to do their thing.