Posts

Showing posts from August, 2023

Week 16 Facia Boards & French Drains

Image
 

Week 16 Sheathing & Taping

Image
 

Week 15 Setting Trusses

Image
 

Week 15 Crane Guy video

Image
 

Week 14 finish deck columns/trusses arrive!

Image
 

WEEK 13 Waiting on trusses

Image
Waiting on trusses (delivery date is Aug 10th).  Braced outside walls for the wait.  Made sure the walls were square, plumb and level.  Built 5 columns for the lakeside deck.