Posts

Week - 8 DIG & PLACE UNDER SLAB PLUMBING

Image
If plumbing could be sexy, this would be it. Two little helpers. Address is posted. Richard was very helpful. 51 feet long 2.5 feet deep from corner to corner for a future building water line . Layout Plan Great visit. Red white and blue works for me. Insulated hot lines. Ken III came prepared to help. The Orange Team. Always wanting to help. We make a great team. Checking level of sand.   Ready for foam and concrete.

WEEK-7 FILLING FOUNDATION AND EXCAVATING

Image
It took 120 yards of sand to fill the foundation and do the needed excavating. Extreme open concept, view from kitchen. Another visitor. 

WEEK-6 CONCRETE WALLS ARE IN

Image
 Finally we have are concrete walls in and they look great.

Week - 5 bust up old footings pick up 2 inch foam

Image
 While waiting for the poured walls to be done we busted up the old footings, clean up the sand piles and picked up 80 sheets of 2 inch foam for under the concrete floors (on sale at Menards). Also had an early morning visitor (turtle). 

Week - 4 Footings in

Image
Two awesome things happened this 4th week of our Lake House Build. First our Footings are in and they look great.  Second, 12 years ago we found a super rare flower/plant (Lady Slipper see pic below), this week we found another 20 feet from the first sighting.